How do electronics manufacturing companies continuously improve?

The unfortunate reality is that most, if not all, electronics manufacturing companies incur waste in the form of inefficient processes. However, without the desire to continuously improve, this waste can lead to a business becoming uncompetitive or their reputation damaged – both of which can lead to a loss of customers.

So, in order to succeed, all employees within a company must be operationally efficient and work towards a common goal of reducing waste.

With so many variables and "opportunities" to create waste, electronics manufacturing services (EMS) companies have an on-going challenge to identify, address and then eliminate inefficient processes. This is where a continuous improvement approach can help.

So, if you have ever wondered how an EMS provider manages this process and what the approach translates to on a practical, day-by-day basis, read on.

Data collection

In order to identify areas for improvement, it is critical that the EMS provider has systems and procedures to collect accurate data. In an electronics manufacturing environment there are multiple sources to collect data, including:

  • Internal databases used to record incoming material quality issues
  • Surface mount assembly and automated optical inspection (AOI) equipment
  • New Product Introduction (NPI) reports
  • Route/ job cards out on the shop floor
  • Test reports
  • Internal process improvement schemes

The type of data can also vary greatly. For example, labour time fluctuations may be recorded against the route/ job card, whereas the number of defects may be captured within the automated assembly equipment software.

Data analysis

Lean and Six Sigma tools are then used to analyse the data, in order to monitor performance, identify any spikes/ trends and help narrow potential root causes. With so much data available it's important that the EMS provider has a process internally to help prioritise their efforts. An effective way to do so is for the continuous improvement engineer to hold a monthly meeting with other stakeholders, so that agreement is reached on which projects should be worked on.

Project implementation

In an ideal world every project that is implemented would be able to demonstrate a clear return on investment (ROI). This is particularly true where investment in new equipment, tools or training are required. However, where "quick fixes" can be made, which clearly eliminate waste, a pragmatic approach by the EMS provider may be taken.

For example, if, via the in-house process improvement scheme, a staff member suggests moving packaging materials closer to the despatch department does a ROI calculation really need to be made? Maybe it does, maybe this was an area crippling the rest of the business resulting in failed customer shipments. Or perhaps it will save the despatch team a few minutes at the beginning of each day. There's not really a right or wrong answer here, except that common sense should prevail.  

Project management

It's likely the continuous improvement engineer will be working on a number of projects at any one time. To keep track of each project at a top level they will record these into some form of project tracker. The specific details of each project will then be recorded separately within a document, following the DMAIC (define, measure, analyse, improve, control) methodology.

Improvement feedback

It's critical that there is a formal process for delivering feedback, not only to the business as a whole but to those individuals that have taken the time to input suggestions and ideas. The quickest way to kill any process improvement scheme dead in its tracks is failure to communicate progress. Ideally, this should be provided back to departments and individuals on a monthly basis. This installs confidence in the overall process and helps grow a culture of continuous improvement. In order to help staff members across the business relate to what is/ isn’t being worked on, the EMS provider may share the "Top 10" projects that have realised tangible results. Unfortunately, it's easy for individuals to dismiss process improvements, particularly within their own areas, so the EMS provider will need a system to inspire and invigorate suggestions.

Improving improvement

If senior management do not support and encourage a continuous improvement approach, then it will be difficult for projects to move forward. A successful approach takes time and dedication, which, of course, comes at a cost. If the senior management don't really see value, or believe it's a box they can tick once a year, the rest of the company will follow suit.  

Senior managers within proactive EMS providers will, however, hold quarterly meetings to discuss improvement projects and will be keen to understand how they are progressing. They will also be challenging the in-house team on how to improve the improvement process and continue to involve more and more staff.

Training

On-going education and training for all staff is essential in creating a successful continuous improvement scheme. The continuous improvement engineer within the EMS provider will be expected to lead in this area and develop training programmes designed to teach employees about waste and how to implement a DMAIC project, utilising Lean and Six Sigma tools. Following these training sessions, attendees will be encouraged to identify their own improvement projects and take ownership in seeing these through.

Hopefully, this blog post has helped demonstrate how EMS providers can, and should be, approaching continuous improvement. As a customer, you may not always be party to the finding or the solutions that are put in place as many improvements are likely to relate to internal processes. However, if you are interested in finding out more about example projects, or the finer details of the programme, we recommend getting in touch with the quality representative within the EMS provider so they can explain some more.

Image by Bill Bradford

New Call-to-action

Written by James Wykes

James is an experienced NPI Engineer with a successful history of continuous improvement in electronics manufacturing. James is skilled in DMAIC Six Sigma, Lean Manufacturing, Failure Mode, and Effects Analysis (FMEA) and holds a Level 5 Diploma in Leadership & Management from the CMI.